BAS/BMS Commissioning
Independent commissioning oversight ensuring your building automation system is fully verified, documented and handed over to the highest standard.
Discuss Your ProjectBMS Commissioning Done Right — The First Time
BMS commissioning is one of the most commonly skimped phases of a building project. When the installing contractor self-certifies their own work, deficiencies are routinely missed — or documented and then ignored. The result is a building that never performs as designed and an owner left managing the consequences for years.
BMS Professional Services provides independent commissioning management — objective, thorough verification that the system has been installed and programmed to specification, every point tested, every sequence proven, and complete documentation delivered to the client at handover.
- Commissioning plan and test procedure development
- 100% point-to-point verification against I/O schedules
- Sequence of operations functional performance testing
- Alarm and interlock testing
- Energy management and optimisation function verification
- Deficiency log management and close-out tracking
- Complete As-Built and O&M documentation review
- Owner training and handover support
- Contractor self-certification with no independent check
- Incomplete sequence of operations testing
- Missing or inaccurate as-built documentation
- Deficiency lists not closed out before handover
- No functional test of energy management functions
- Inadequate owner training on system operation
Frequently Asked Questions
Protect Your BMS Investment With Independent Commissioning
Don't let your building go live with an unverified BMS. Talk to our commissioning specialists today.